Harken SB 2:1 Genoa Lead Performance Car - No Wire
Pickup available at 1830 East Interstate 30
Usually ready in 24 hours
Shipping and Delivery
Free shipping for orders of $98 or more (US Continental)
- Free shipping for orders of $750 or more (International)
- Add 3 business days to the standard shipping time for USPS deliveries.
- UPS and FedEx Ground usually take 2 to 5 business days for in-stock orders.
- UPS and FedEx deliver on Saturdays only for Friday overnight shipments, which may incur an extra
charge. - Orders that apply for free shipping will be delivered between 8 and 10 business days.
- International customers will be responsible for any applicable import duties,fees, or taxes.
- Oversized items like whisker poles, spinnaker poles, and tracks over 7 feet require freight shipping, with an estimated cost of $500 depending on the destination.These orders must be delivered to a
commercial address, such as a marina, yacht club, or boatyard where your sailboat is located.
A recipient must be present to sign for the delivery upon arrival,For more info, Click Here.
Harken SB 2:1 Genoa Lead Performance Car - No Wire
Adjustable genoa lead cars feature recirculating Torlon ball bearings for easy adjustment under full sheet loads. Stainless steel sheave carriers pivot 60 degrees to accommodate changing lead angles. Available as a non-CB car on a car loader to run on a non-CB style track supplied before 2002. Torlon is a registered trademark of Solvay Advanced Polymers L.L.C.
Technical Description
| Sheave Ø (mm) | 45 mm |
| Sheave Ø (in) | 1 3/4 in |
| Length (mm) | 105 mm |
| Length (in) | 4 1/8 in |
| Width (mm) | 57 mm |
| Width (in) | 2 1/4 in |
| Weight (g) | 389 g |
| Weight (oz) | 13.71 oz |
| Maximum working load (kg) | 567 kg |
| Maximum working load (lb) | 1250 lb |
| Breaking load (kg) | 1134 kg |
| Breaking load (lb) | 2500 lb |
| Use with track/rail | 22 mm |
